mcfadden logo top Fair Payment Campaign ISO9001 Construction Line HAS Construction Leeds
mcfadden logo bottom  
Case Studies
McFadden carry out work on a huge range of projects of all sizes. Here are just a few examples:
 
 
 
Case Study Image
     Project:
Warner Village Leisure and Restaurant Complex
     Location:
Leeds
     Client:
HBG Construction
     Value:
£
     Works:
Reinforced Concrete Frames, Retaining Walls, Basements, Drainage
Case Study Image

Case Study Image

Case Study Image

Case Study Image
 
A testimonial from one of our many satisfied clients:

'Performed very well under exceptionally restricted circumstances.'
S E Robinson
Construction Manager




Latest Case Studies:
Case Study Image
New Office Blocks
 
Case Study Image
Rodillian School
 
Case Study Image
Student Accomodation
 
Case Study Image
Luxury Appartments, Phase 1 and 2, Victoria Mills
 
Case Study Image
Doncaster Education City
 
Case Study Image
Elmete Hall
 
Case Study Image
New Office Block, Lafarge Concrete
 
Case Study Image
Fargate Redevelopment
 
Case Study Image
Waterfront Development
 
Case Study Image
Leisure and Retail Complex
 
Civil Engineers, Leeds  |  Reinforced Concrete Frames  |  Post Tensioning  |  Basements  |  Sub-Structures  |  Groundworks/Landscaping  |  Drainage

all content © 2008 McFadden (Construction) Ltd    |    site designed & maintained by P2 Technologies Ltd

McFadden (Construction) Ltd, 2 Carr Crofts Drive, Armley, Leeds, West Yorkshire, LS12 3AL

Civil Engineers | Concrete Frames | Formwork | Shuttering | Retaining Walls | Leeds | Yorkshire

T - 0113 231 1454    F - 0113 231 1455