mcfadden logo top Fair Payment Campaign
mcfadden logo bottom  
Reinforced Concrete Frames
 
McFadden Construction Ltd undertake the full package construction of reinforced concrete frames and structures, including reinforced concrete frames, retaining structures, reinforced concrete cores and the installation of pre-cast pods and members.

We provide:
  • Engineering
  • Design
  • Detailing
  • Labour
  • Plant
  • Materials
  • Supervision
  • Drainage
  • Pre-cast
Great care is taken to design all temporary works, edge protection, fall arrest, hoisting, distribution, scaffold and drainage solutions to minimise and effectively manage risks associated with working at height.

All labour is fully trained, experienced and competent, and hold CSCS/CPCS cards.

All plant is wholly owned, fully certified, tested and maintained.

All materials are BS approved and supplied in accordance with the appropriate specifications and approved Quality Assurance systems.

Click here to view a Case Study.
 
Latest Case Studies:
Case Study Image
Rodillian School
 
Case Study Image
Student Accomodation
 
Case Study Image
Luxury Appartments, Phase 1 and 2, Victoria Mills
 
Case Study Image
Doncaster Education City
 
Case Study Image
Elmete Hall
 
Case Study Image
New Office Block, Lafarge Concrete
 
Case Study Image
Fargate Redevelopment
 
Case Study Image
Waterfront Development
 
Case Study Image
Leisure and Retail Complex
 
Case Study Image
White Rose Business Park
 
Reinforced Concrete Frames  |  Post Tensioning  |  Basements  |  Sub-Structures  |  Groundworks/Landscaping  |  Drainage

all content © 2008 McFadden (Construction) Ltd    |    site designed & maintained by P2 Technologies Ltd

McFadden (Construction) Ltd, 2 Carr Crofts Drive, Armley, Leeds, West Yorkshire, LS12 3AL

T - 0113 231 1454    F - 0113 231 1455